Science

Transfer of migrating eels at Maurik hydropower plant

Illustration

Professional fishermen transferred more than 9,000 kilograms of adult European eels past the hydropower plant in Maurik, Gelderland, over the previous two months. The fishermen said this was a record for the site. They catch eels before they reach the dam locks and power plant, then release them on the other side to prevent injuries from the turbines; other fish caught during the operation are returned to the water.