Leakage continues at Veluwemeer Aqueduct
Published
The Veluwemeer Aqueduct is still leaking, and water remains on the N302 beneath it. The cause is unclear. Earlier repair work in May, which was based on the assumption that groundwater was leaking through several joints, proved inadequate, and the cause now needs to be sought elsewhere. Traffic is warned with signs, and the speed limit has been reduced from 80 to 50 kilometres per hour.
The water is being removed, and measures are being taken to prevent it from freezing. The search for the leak is expected to continue during the next winter period and could take a long time because of the aqueduct’s complex construction. The N302 is an important connection between Flevoland and the A28 near Harderwijk.
Written by a machine
The title, summary and illustration are written by AI from the coverage, never copied from a newsroom. When they disagree with the reporting, the reporting is right.